Wed., May 26 – Boston – Neponset River Greenway Design Public Hearing – 7 pm

Join the live virtual design public hearing to learn more about this exciting project!

Wednesday, May 26 at 7 pm

Boston – Neponset River Greenway Design Public Hearing

 

 

We’re very pleased to share that progress is being made with the proposed Neponset River Greenway extension project!

The project is a critical segment of MassDCR’s long-term, multi-phase plan for the 10.5-mile Neponset River Greenway linking the Blue Hills Reservation in Milton to Mattapan Square and continuing to Castle Island and the Boston Harborwalk.


Register here to join the public hearing.


The proposed project includes:

  • Construction of a shared-use path, from Tenean Beach to Morrissey Boulevard, a total distance of approximately 3,600 feet (0.7 miles)
  • A 670-foot long boardwalk, including scenic overlooks, to convey the path over the salt marsh and tidal habitat of the Dorchester Bay
  • Drainage system improvements
  • Wayfinding signage and pedestrian and bicycle roadway crossings

Leave a Reply

Your email address will not be published. Required fields are marked *

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.